Going up

The major work upstairs has started in the last week – parts of the roof have been taken out and the wall that will split the bedroom and landing has been started. Our fabulous builders are reusing as much of the original material as they can, so this wall is mostly being built out of chimney.

We were there briefly during the week this week, so were able to meet with the electrician and talk through the rewiring as well as seeing recent progress. The electrics are a bit of a mixed set at the moment (“Have you got an outside socket?” “Well, there’s a socket outside.” “Umm, that’s just an extension lead.” “Ah.”) so we are having the whole house rewired to modern standards. This also includes moving most of the light switches as we have moved some doorways and, because we’ve changed the use of rooms, will be changing which way doors open. Apparently we don’t need a shower pull in the middle of the kitchen either. It has been an interesting challenge trying to decide where we want plug sockets and lighting, especially with sockets in the kitchen, but we now have a plan to start with, even if it gets adjusted nearer the time.

DSC_0015 (Medium)
The light switch next to that ex-doorway probably isn’t so useful any more.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s